UK: Ongoing operations at Horse HillMap of UKOG license interests in the south east England. Source: Xodus Group

UK: Ongoing operations at Horse Hill

The onshore Horse Hill Kimmeridge oil pool in has now produced a total of 36,559 bbl of dry Brent quality crude.

According to UKOG, test production from the Horse Hill-1 Kimmeridge oil pool was temporarily shut-in to permit oil storage tanks and flowlines to be relocated to enable safe simultaneous drilling and HH-1 testing operations.

Kimmeridge test oil production has now resumed and will continue until the rig arrives when a further short shut-in will occur to enable the HH-2/2z drilling set-up to be assembled.

Total aggregate Portland and Kimmeridge test production now stands at a landmark 66,127 bbl. Kimmeridge production is planned to continue during the drilling campaign.

The horizontal well section, HH-2z, with a planned trajectory of up to 1000 m wholly within the Portland reservoir, will follow directly afterwards.

COMMENTS

WORDPRESS: 0
X